850 'Lord Nelson' Update - 6th February 2006
6th February 2006
<-- Index | Showing 1-6 of 6 pictures | Index -->
Monday 6th February 2006 - Update on Lord Nelson shows the boiler now in position in the frames. A major step forward but still plenty of work to be done before the loco is finally completed.

The first two pictures were taken before the boiler was lifted into the frames at the end of 2005.
Prior to the boiler being lifted into the frames, it was positioned on the flatbed wagon just outside the regular workshop.
Prior to the boiler being lifted into the frames, it was positioned on the flatbed wagon just outside the regular workshop.
800x600
Pic_0693.jpg
Inside the smokebox with the new elements and the superheater in view.
Inside the smokebox with the new elements and the superheater in view.
800x600
Pic_0694.jpg
27th February, Not alot of differences but the engine is now ready for an inframe steam test.
27th February, Not alot of differences but the engine is now ready for an inframe steam test.
800x600
Pic_0766.jpg
850
850 "Lord Nelson"
800x600
Pic_0767.jpg
850
850 "Lord Nelson" The end is near!
800x600
Pic_0769.jpg
The right hand motion.
The right hand motion.
600x800
Pic_0770.jpg