The boiler finally returns to Eastleigh. 800x600 Pic_0621.jpg |
Side view of the newly restored boiler. 800x600 Pic_0622.jpg |
Reversing back ready for lifting. 800x600 Pic_0625.jpg |
Reversing back ready for lifting. 800x600 Pic_0626.jpg |
In position. 800x600 Pic_0627.jpg |
The old smokebox is removed from the lorry first. 800x600 Pic_0628.jpg |
3,2,1 Lift! 800x600 Pic_0630.jpg |
The boiler is removed from the lorry. 800x600 Pic_0631.jpg |
Now for lifting onto the wagon. 800x600 Pic_0632.jpg |
Gently does it. 600x800 Pic_0633.jpg |
In position, now ready for lowering. 800x600 Pic_0635.jpg |
Almost there..... 800x600 Pic_0636.jpg |
The firebox touches down first. 800x600 Pic_0637.jpg |
Then the smokebox rests onto the wagon. 800x600 Pic_0638.jpg |
The boiler now resting on the wagon. 800x600 Pic_0639.jpg |
ERPS members securing the boiler to the wagon before propelling the wagon backwards. 800x600 Pic_0640.jpg |
The boiler heads back towards the shed and the loco. 800x600 Pic_0641.jpg |
A closer view. 800x600 Pic_0642.jpg |
Almost there..... 800x600 Pic_0643.jpg |
The boiler stationary with the loco just in view. 800x600 Pic_0645.jpg |
| |